1
محیط زیست و منابع طبیعی::
آب تصفیه
In planning the introduction of purification water, the necessary water volume for purification shall be determined through investigation of the water quality and flow volume of the subject water body.
Methods of securing flow volume include the conveyance of purification water from another river, etc. and the securing of maintenance flow discharge by using a dam, etc.
Here, the securing of purification water by water conveyance will be described.
In the process of planning, since the amount of purification water differs depending on the use of river water and the status of the sewerage system, it is necessary to clarify the estimated effects at different times by thoroughly considering the current state as well as future changes.
It is also necessary to confirm the discharge capacity of the channel that receives the purification water.
واژگان شبکه مترجمین ایران